Current roadworks and road closures in Radebeul
Straße
Beschränkungen
Tätigkeit
Marienstraße, house number 8, between Ed.-Bilz-Straße and Hauptstraße
Total closure
Installation of a domestic sewer connection
Waldstraße between the entrance to the town and August-Bebel-Straße
Total blocking
Canal and road construction
August-Bebel-Straße, junction with Waldstraße
Total closure
Sewer and road works
Winzerstraße junction with Gradsteg
Complete closure
Sewer construction, laying of drinking water pipes
Clara-Zetkin-Straße between Schillerstraße and the Goethestraße junction (inclusive)
Total blocking
Renovation of combined sewer and drinking water pipes, sewer construction, road construction
Jägerhofstraße between Jagdweg and Auf den Bergen
Complete closure
Retrofitting of a retaining wall
Wasastraße between the railway bridge and Pestalozzistraße
Half-lane closure with the introduction of a one-way system
Crane installation and material storage for the construction of blocks of flats
Mobile town hall
You can also find all road closures in the free and registration-free Radebeul citizen app